Bubblebarn erection
Home | Erection | Dimensions | Manuals

1. The four feet are bolted to concrete pads
 
2. The main frames laid out and assembled
 
3. Frames fitted to feet and lifted in turn

4. Frame assembly complete
 
5. Cover folded and rolled in a special way so it can be 'unrolled' over the frame by pulling a rope with a car. (Note winch for opening the Bubblebarn)

6. Once cover is over frame as a 'sausage' it can be manually opened over the frame.


7. Tabs on the inside of the cover are tied to each frame and the perimeter tied to the bottom frame. The Bubblebarn is complete !
Home
CONTACT
TAME Ltd. Radwell Lodge, Baldock, Herts, SG7 5ES UK.
+ 44 (0)1462 834776 FAX + 44 (0)1462 732668
Email